Scope
Floor system
Work
MS deck
Status
Completed
Drawing
The drawing phase confirmed layout, support conditions, and fabrication requirements for the floor system.

Working
Fabrication and fit-up were managed to keep the deck aligned with site conditions and installation needs.

Completed
The completed floor and deck system was finished with final inspection and site-ready handover.